The estimated time remaining that shows in the Export queue is severely underestimating the time to complete for Starlight Precise 2.5. For example, I am currently converting an approximately 6m video (original resolution is 640 x 480) up to 4x (2624 x 1920). The export job has been running for 7h46m and is approximately 80% complete, but it’s estimating 15m remaining to complete the job. It seems to me it’s going to take at least another 1h30m for it to complete. The time estimates also constantly fluctuate up and down (often times going down all the way to 0s remaining estimates).
Other than the time estimates being fairly useless and I wish the exports didn’t take as long, the quality of Starlight Precision 2.5 is unmatched. This is the most pleased I’ve been with Topaz Video since I’ve owned it.
OS: Windows 11, CPU: Ryzen 7 7800X3D, RAM: 64GB, GPU: RTX 4090.